Double the Power!
We have officially taken delivery of the “Made-in-Vietnam Aircraft Carrier” and put it into operation.
The vessel is equipped with a state-of-the-art engine room meeting international standards, featuring a complete range of modern equipment and advanced systems.
The vessel also includes fully equipped working offices and meeting rooms to accommodate a crew of 12 members, ensuring efficient operation and management during offshore activities.
The enclosed sanitary facilities are integrated with advanced water filtration and wastewater treatment systems, meeting international environmental standards before discharge into the surrounding environment.
Along with many other modern features, we will introduce more detailed information in our upcoming articles.
With strong confidence in the capabilities of Pha Rung Shipyard, we will continue investing in the construction of the second “Aircraft Carrier” vessel, featuring a larger size, wider capacity, and more advanced technologies.
We are constantly challenging ourselves, breaking our own records, and striving to ensure that PAG’s wind power projects are completed on schedule.
PAGROUP.VN
Tiếng Việt